• Data center energy plant in Jastrebarsko is designed and constructed in a scalable, durable and flexible manner with an emphasis on minimizing downtime and also allows for future growth, depending on the needs.
  • The total capacity of the data center in Jastrebarsko will be 4 MVA. Except that the data center is powered by two different transmission line loop, the center has a redundant power transformer facilities 4 MW, and redundant power switching nodes.
  • As an alternative, the data center is ready diesel engines with 4 x 1.6 MW synchronous operation (guaranteeing the independence of DC’s 72 hours at full load), and the UPS system in the model 2N +1
  • After all phases of deployment, data center Jastrebarsko will be able to offer customers an average of 3.075 kW/m2.
  • Every piece of white space space is scalable and flexible so that it can serve the needs of customers ranging from 1.6 kW to 7 kW per rack
  • Complete electric power plant is designed in such a way that the configuration of 2N and N +1 in order to ensure resilience to loads that could lead to the inability to provide the desired level of SLA contract.